Pricing

You only pay when we deliver results.

Our fee is a percentage of the additional revenue (uplift) that DAMagedOpt generates for your plant. The better the data you provide, the lower your percentage.

Better data = lower cost
50%
of uplift

No Hillchart

DAMagedOpt estimates your turbine performance curves from operational data alone.

  • No hillchart data required
  • Performance curves estimated by our AI
  • Maximum compensation work by DAMagedOpt
  • Full optimization & monitoring included
Contact us for a custom assessment
45%
of uplift

CFD Simulation

You provide hillcharts generated by computational fluid dynamics (CFD) simulation.

  • Numerical simulation hillcharts provided
  • Moderate data accuracy
  • Less estimation work needed
  • Full optimization & monitoring included
Contact us for a custom assessment
35%
of uplift

Scale Model

You provide hillcharts measured on a reduced-scale physical model in laboratory conditions.

  • Laboratory-measured hillcharts provided
  • Good data accuracy
  • Minimal estimation work needed
  • Full optimization & monitoring included
Contact us for a custom assessment
Best Value
20%
of uplift

Full-Scale Prototype

You provide hillcharts measured on the actual full-scale turbine — the gold standard.

  • Real turbine measurement hillcharts
  • Highest possible data quality
  • Near-zero estimation work needed
  • Full optimization & monitoring included
Contact us for a custom assessment

What is uplift?

Uplift is the additional revenue generated by DAMagedOpt's optimized dispatch compared to your plant's baseline operation. We measure it transparently so you only pay for real, verified gains.

What are hillcharts?

Hillcharts (also called turbine efficiency maps) show how efficiently a turbine converts water energy into electricity as a function of hydraulic head and flow rate. Higher quality hillcharts allow DAMagedOpt to build more accurate digital twins, leading to better optimization results.

2024 Real Market Proof

+10.76% net revenue uplift on real DE-LU market data

300 MW Francis reference turbine · Full calendar year 2024 (annualised) · SMARD DE-LU day-ahead prices · spec-estimated hillchart

Naive baseline
€62.98M
/year
Price-following baseline after wear
DAMagedOpt optimized
€69.76M
/year
Deterministic DP · spec hillchart
Net uplift
+10.76%
+€6.78M /year

Methodology: Deterministic dynamic programming replayed over 4 representative 2024 DE-LU seasonal weeks (672 h), annualised by ×13.07 to a full leap year. Reference: 300 MW Francis turbine, spec-estimated hillchart (no measured data). Wear costs enforced identically for both strategies; wear is 3.5% of gross revenue.

Results are for a reference turbine under 2024 DE-LU market conditions. Your actual uplift depends on your turbine specs, hill chart quality, reservoir configuration, and local market prices.

Get the full 2024 backtest reportPDF · Instant download · €49

Methodology + results · Instant download · No sales call

5–7 business day delivery · One-time fee · No subscription · Stripe checkout

Paid Engagement · €900 flat fee

Turbine Uplift Diagnostic — what you get

  1. 1
    Send: turbine specs + optional hillchartRated power (MW), design head (m), machine type (Francis/Kaplan/Pelton/pump-turbine), optional measured hillchart or SCADA traces
  2. 2
    We deliver: full-year ENTSO-E/SMARD backtest + defensible uplift reportDeterministic DP replay over real 2024 DE-LU day-ahead prices. Same methodology as the €49 sample report — applied to your exact turbine.
  3. 3
    Fee credited: €900 deducted from your first uplift-based contractIf you proceed to a performance contract, the diagnostic fee is fully credited — it is not an additional cost.

The €49 proof report shows the exact methodology and format you will receive. Numbers in that report are for a 300 MW Francis reference turbine; your report uses your specs.

Indicative prior — not a guaranteed uplift. Accuracy improves with better hillchart data. Results depend on your turbine, reservoir, and local market prices.

5–7 business day delivery · One-time fee · No subscription · Stripe checkout

Turnaround

Typical delivery: 5–7 business days

Estimate your uplift savings

Enter your plant parameters to see what DAMagedOpt could generate for you

MW
GWh
€/MWh

Get your free uplift estimate — no commitment